Free construction labor-pricing tool

Construction Crew Loaded Cost & Bid Rate Calculator

Turn wages into the true cost of putting a crew in the field, then calculate the productive-hour and crew-day bid rates needed to recover overhead and protect margin.

Simple crew builder

Build the weekly crew cost

Productive-Hour Reality Check
RoleWorkersBase wageBurdenFringe / hrRegular hrsOT hrs
Bid-rate logicBase wage is loaded with the entered burden and fringe. Overtime uses the entered wage multiplier, then burden and fringe are applied. Field overhead is added to weekly labor cost. Productive hours are paid hours × productive utilization × (1 − lost-time allowance). Office overhead and contingency are then added before solving for the bid revenue required to hit the target gross margin.
Crew Cost Waterfall

How wage turns into true productive-hour cost

Simple crew model
Bid Rate Ladder

From cost recovery to target margin

Productivity sensitivity

Required bid rate as productive utilization changes

Productive utilizationProductive hoursCost / productive hourBreak-even bid rateTarget bid rate